1.The installation must be stable and solid concrete mixer,tires must remove the overhead or otherwise custody and must erection rain rain,smashing or insulation work shed. Operating locations keep clean,Pengwai should dig located exclude mechanical wastewater settling tank cleaning.
2.Concrete
mixer power wiring must be correct,there must be reliably protected by zero (or
protective earth) and leakage protection switch,wiring and insulation must meet
the requirements ministries.(The electrician)
3.The
operation drivers must be trained and pass an examination to obtain operating
permits are prohibited non-driver operation.
4.The
driver must be clean,tighten,lubricate,adjust,corrosion Cross working
method,each time for serious concrete mixer parts
Maintenance.
5.Each
time the work began,should examine carefully the various parts for anomalies.
Should be checked before starting clutch,brake and various protective devices
are sensitive and reliable,rope without damage,tracks,pulleys is good,the body
is balanced,surrounded by accessible,sure no problem,the order closing the test
machine.2 to 3 minutes commissioning,drum rotation balance,no beating,no
deviation,in normal operation,no abnormal sound,then the official production
operations.
6.After
the machinery running,the driver must be thinking focus,stick to their
posts,not AWOL.And shall always pay attention to the functioning of the
machine,if found irregularities or hear unusual sounds,the material must be
kept barrel release,shut down for maintenance.
7.Mixer
in operation,repair and maintenance is strictly prohibited and not allowed out
into the barrel with a tool Grilled material.
8.When
the material must not exceed the specified prohibited overload.
9.When
the hopper upgrade work is prohibited in the hopper below or passage.Need to
clean the hopper pit drought,must first contact with the driver until the
hopper with safety hooks for hanging firmly behind the prospective conduct.
10.When
the overhaul mixer, must cut off the power, for entering the drum overhaul,
there must be "someone is working, DO NOT TURN ON" nameplate hung at
the gates box, and a manned, to be absolutely guaranteed to avoid mistakenly
sent a power accident.
11.After
production has stopped, a timely scrub clean the inner and outer tube to
prevent concrete bonding, after work, will be promoted to the top position
hopper with safety hooks for hanging prison. Before leaving the field to pull
down the gates and lock gates box.